Skip to main content

Commercial Charging Solutions For Hertfordshire Businesses

Commercial EV Charging Installation In Cheshunt , Hertfordshire

ElectrAssure delivers commercial EV charging infrastructure exclusively for businesses across Cheshunt. From site survey to commissioning, we handle every stage of your installation from start to finish.

EV Charger Installation For Organisations Across Cheshunt

Cheshunt offers direct access to the M25, making it a strong base for the area’s high concentration of logistics and fleet operators in Hertfordshire. The town is home to Theobalds Business Park, where companies including Google and Stephen James Group are based while local enterprise is further supported by workspace at Caxton Hill and Cheshunt Business Hub. 

Cheshunt’s direct links to motorways such as the M25 make the area commercially appealing, and support a strong case for EV fleet infrastructure. Vehicles covering motorway corridors need charging solutions built around operational schedules, not convenience. 

ElectrAssure works exclusively with businesses, fleet operators, and commercial organisations. We do not install residential chargers. Every project we undertake is designed around the operational realities of a working business, including power demand, vehicle throughput, shift patterns, and the need for zero-downtime infrastructure.

Our team manages the entire process, including the initial site survey, DNO applications, infrastructure design, installation, and commissioning. Our post-installation services also include ongoing maintenance and Chargepoint Management System (CPMS) integration, included as standard for clients who need it.

How We Work

Our installation process is a simple 4 step process.

  1. Site Survey – Our engineers assess your site. That includes things like existing power supply, cable routes, parking layout and future capacity needs.
  2. Infrastructure Design – We design a charging solution around your operational requirements, not a generic off-the-shelf layout. We also take into account your future scale.
  3. Installation / Fit Out – Our OZEV-approved installers handles all civils, cabling and chargepoint installation with minimal disruption to your business.
  4. Commissioning & Ongoing Support – Full system commissioning, CPMS onboarding and ongoing maintenance packages to keep your infrastructure performing.

Chargepoints For Local Businesses

47KW-DC_EU_stand_L

All EV Chargers

We have a wide range of EV Chargers available.

Autel MaxiCharger DC Fast - 120kW

DC Chargers

High-power DC chargers ranging from 20kW to 360kW.

Autel-DC-MaxiCharger-Compact-–-47kW

Autel Chargers

Autel offers smart, fast reliable charging.

Garo – GTB AC 7 22kW Charger

Garo Chargers

Garo offers efficient charging solutions.

Case Study

Expanding Volkswagens infrastructure

The reasons Volkswagen choose ElectrAssure to deliver EV charging infrastructure for their ports and National PDI Centre.

Commercial EV Charging Installation Across Cheshunt

A commercial EV charging installation is more than fitting a chargepoint to a wall. For most Cheshunt businesses, the work begins with a DNO application to secure the additional power supply your site will need.

This is usually needed for multi-bay or high-power DC installations. This process requires engineering expertise and familiarity with the local distribution network, and it’s where inexperienced installers frequently cause costly delays.

From there, the design phase determines charger placement, cable routing, load management and battery storage strategy.

For larger sites, a Chargepoint Management System allows you to monitor usage, allocate costs across departments or vehicles, and control access by RFID card or app.

Our team can also guide you when it comes to Government funding which remains available for eligible businesses through schemes including the Workplace Charging Scheme. This particular scheme offers up to £350 per socket. If applicable, our team can take care of grant applications as part of the project process.

Our goal is to equip Cheshunt businesses with all of the expertise and support needed during this transition.

Expert Charging Station Installation

Areas We Cover Across Hertfordshire

News & Articles

18th Aug 2026

What Megawatt Charging is and why it matters for HGV depot planning

The Megawatt Charging System (MCS) has been in development since 2018, but it remained a work in progress until early 2026, when the industry body behind it published the first formal technical standard for MCS. This sets out how the...

Read More
5th Aug 2026

Is the UK’s Charging Network Keeping Up With Demand? New Data Says Yes

One question comes up regularly when we’re talking to businesses about EV infrastructure investment: “is the public charging network actually reliable enough to support a serious transition?” It’s a fair concern, and new research gives a fairly direct answer. Zapmap...

Read More
5th Aug 2026

Fleet EV Growth Hits New Highs As Almost One in Three New Cars Fully Electric (2026 statistics)

The latest registration numbers from the Society of Motor Manufacturers and Traders (SMMT) confirm that EV uptake is picking up speed, with fleet adoption driving much of the surge. The headline stats June 2026 has been a strong month for...

Read More